Thursday, June 6, 2019

Setting Up a Network at a New Office Essay Example for Free

Setting Up a communicate at a New Office Essay1.1 GeneralSetting up a new network at a new office will require the purchase of new workstations, install(a)ing a new server, or implementing network security and virus protection systems network wide. LC Comm primary goal is to translate the technology needs of your building into an industry standard solution that produces clear, distinct results for the wadiness. It is also my goal to educate and help you understand some of the more technical aspects of your network upgrade by putting it into a simple, easy to comprehend. Network planning and network upgrades performed will follow the accepted best practices of successful installations.This butt and my exclusive 100+ point calculate checklist ensures consistent results with zero or minimal disruption to your office during the course of the network planning, network upgrade, server installation or new reckoner installation. Since I place my highest values on consistent, rel iable solutions for the long-term happiness and productivity of your office, you can feel confident I will only recommend proven network planning and network upgrades that will accomplish these goals and not those that are the coolest or newest at the time. An IT project is an endeavor with a definitive timeline (start date and end date) during which specific goals and objectives are met. Projects come to pass in addition to the regular maintenance of your network and technology equipment, and often emerge as a result of issues discovered during regular maintenance.1.2 General mountain range of WorkLC Comm. proposes to produce contract specifications and construction drawings for all building spaces as well as the communications cabling system. This will include the plan views of all equipment rooms, labs, MDF/IDFs and the aggrandizement views of equipment racks and cabinets. In general, this includes the following 1.2.1Participation in the design process. LC Comm will work with the guest to validate space requirements and produce electrical and mechanical program requirements for all computer room and telecommunications facilities and equipment. This includes CAD plan drawings of computer room and telecommunications room equipment. It also includes CAD elevation drawings of the network and server cabinets. As a participant in the design team, these requirements and drawings will beconveyed to the architects and engineers for inclusion into the schematic drawings, the design development drawings and terminalized in the construction documents.1.2.2 Assist Customer in designing the local and wide-area networking requirements. This includes some(prenominal) high-speed lines that will be required in the new main site and other locations. Full back up and redundancy is assumed.1.2.3 Assist Customer in placing all computer and network equipment on the drawings. 1.2.4Production of the building communications cabling systems requirements as whitethorn be require d. These include the data structured cabling system for the building, bus tag cable design should a large mainframe be involved and inter-cabinet cabling systems between the network and server cabinets. 2.0Specific Scope of Work2.1Schematic Design2.1.1Validate all space requirements for the technical areas associated with the data center complex. This includes but is not limited to the following Computer equipment areaOperations console areaDisk give rise and tape robotsNetwork areaServer areaPrinter and paper storage areasStaging areasEnvironmental systems on or under the raised beautify area Technical support areas outside of the raised floor area satiateing roomsStorage spaces2.1.2 introduce in the design and data gathering process to determine, produce or participate in the followingRough draft of computer and network equipment layoutsDiscussion of adjacency requirements for the data center operating areasParticipate in discussions to determine facility design requirementsPar ticipate in meetings to determine what computer and network equipment will be acquired for the new data center suppuration of preliminary high-level project schedule with milestones.Data gathering for communications and network cabling requirementsData gathering ofenvironmental requirements for computer and network equipment that will be in the raised floor and telecommunications facilities. (Power and Cooling Profile)Gather requirements for telecom initiation requirementsIdentify MDF and cable entrance areasIdentify fiber and cable provider vaults on or near propertyBegin early draft of communications cabling specificationParticipate in discussions on redundancy of environmental systems and the elimination of whatever single point-of-failureParticipate in discussions on disaster recovery and business resumption2.1.3 Participate in discussions to identify design requirements for the telecom fiber and grunter entrance cables.2.1.4 Participate in scheduled and ad hoc meetings as ma y be required to produce required deliverables. Meet with vendors as may be required. 2.1.5 Document technical meetings and discussions. Reproduce and distribute documentation.2.2 Design Development2.2.1 Finalize plan view of equipment layouts for MIS, IT, network, server, telecommunications and PBX systems2.2.2 Finalize detailed environmental requirements for all MIS, IT, network, server, telecommunications and PBX systems2.2.3 Produce final draft of the communications and network cabling specifications. This includes and custom specifications for cable cart track, network cabinets, under floor fiber cable tray systems2.2.4 Produce final draft of telecom grounding requirements2.2.5 Produce final draft of project schedule with milestones 2.2.6Produce draft of network and server cabinet elevation drawings2.2.7 Produce draft electrical panel surf assignments for Electrical Engineer2.2.8 Participate in scheduled and ad hoc meetings as may be required to produce required deliverables. Meet with vendors as may be required.2.2.9 Document technical meetings and discussions. Reproduce and distribute documentation2.3 Construction Documents2.3.1Finalize all construction specifications for the followingStructured communications cabling system. Includes RFQTelecommunications entrance facilitiesInter-connecting cabling system for the network and server cabinetsCable runway for PBX (MDF) and IDF areasUnder floor cable tray for fiber cables2.3.2 Finalize construction drawings for the followingStructured communications cabling system. Includes elevations telecom racks in the MDF and IDF areas. Includes book of instructions for seismic bracing Telecommunications entrance facilities. Includes fiber mux areasInter-connecting cabling system for the network and server cabinets. Includes elevation drawings showing connecting hardware and equipment in the network and server cabinetsCable runway for PBX (MDF) and IDF areasUnder floor cable tray for fiber cables2.3.3 Participate in scheduled and ad hoc meetings as may be required to produce required deliverables. Meet with vendors as may be required.2.3.4 Document technical meetings and discussions. Reproduce and distribute documentation.2.4 Bidding and Negotiation2.4.1 Attend bid conferences and walkthroughs as may be required.2.4.2 react to RFIs as may be necessary2.4.3 Produce specification or drawing modifications as may be required2.5 Construction Administration2.5.1 head job site periodically. Observe and comment on construction of equipment and network facilities. Produce documentation where required 2.5.2 Participate in architectural and construction project meetings where required

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.